How To Build A Concrete Dam Wall
This website has a good explanation of hydrostatic forces on a dam surface.
How to build a concrete dam wall. Estimate the length of the critical period t days during which the. Cover the foundation with a 1 foot high layer of large rocks. The concrete gravity dam has weight as its strength. If you want your dam to block or divert water for more than a short time you ll need longer lasting materials than rocks and stick.
Prized for their strength and versatility concrete retaining walls require precise construction methods. Concrete dams are built in four basic shapes. Rollers are then driven over the concrete to compact it down. Concrete is then transported to the area between the walls and spread in a thin layer using bulldozers.
This is done by diverting the river through a tunnel that runs around the intended construction zone. How to build a concrete retaining wall a step by step guide to pouring concrete walls updated june 26 2020. Pack the branches downward tightly behind the dam on the dam. Poured concrete retaining walls can be colored textured.
The dam is raised in steps of about 600 mm. Peg your site out with stakes and mark your levels with a laser level. You could build your wall with a submerged lip to help counteract the moment applied by the water pressure on the vertical face of the wall. Estimate the area of the reservoir a m 2 the evaporation and seepage losses per day e mm per day and hence the volume of losses per day a.
Once the concrete dries it will continue holding back the water well into the future. Remove the topsoil from the site. For me it was a sheepsfoot compactor excavator skid steer and sodium. Get your equipment and materials ready.
Ideally you should. Determine the water requirement per day r litres per day. The edges are formed first by making low concrete walls on the upstream and downstream faces of the dam. Saw tree branches to a length that equals the full length of the dam.
I did some quick calculations and got the following. A cross section of this dam looks like a triangle and the wide base is about three fourths of the height of the dam. With this high level of technicality comes incredible versatility. Mix a bag of quick setting concrete mix with water in a large bucket or wheelbarrow and pour the wet concrete into the cracks.
Dam construction must be started when river levels are low.