How To Attach Roof Shingles
Use your chalk and tape measure to mark about 12 inches up on the roof for the first set of shingles.
How to attach roof shingles. Repeat this basic pattern alternating shingles across the roof working toward the right side using the chalk line to keep the shingles straight horizontally. Lay the first row of shingles directly covering the narrow starter row. Every 5 inches make a new mark until you get to the rop of the roof. Overlap each metal piece by at least 150 mm 6 and use asphalt plastic cement under each section of overlap.
Place these starter strips side by side on the tar with their edges. Known in the trade as vertical racking or staggering this how to lay shingles method enables the roofer to install a single column of shingles all the way to the peak without the wasted back and forth motion necessary to fill several rows of stair steps. As mentioned above place the first 6 inches 15 cm of the second layer on top of the first layer. Cut six inches off the length of the first starter shingle nailed on then use the rest of them full size.
Use 4 nails per shingle and 6 nails on the prevailing windward sides of the roof as wind resistance nailing. Repeat this on both sides of the roof. Center a minimum 610 mm 24 wide minimum 28 gauge pre finished galvanized metal valley liner in the valley and fasten with only enough nails to hold it in place nailing at the edges only. Open a pack of three tab shingles.
Get your trowel and another scoop of cement and apply it on the roof below the second chalk line. Use the chalk line to snap a straight line vertically every 6 inches. Watch and see how easy it is. Handy home shows you universal shingling techniques that can be applied to any shed.
Apply roofing cement and secure the second layer to the roof. Snap a horizontal chalk line over the starting row to use as a guide. Many pros shingle in a vertical line up the roof because it s much faster. Butt a full shingle up against the cut shingle and nail into place.